New Plans for Centene Auditorium & Parking Garage

Design for the largest project downtown Clayton has ever seen continues to evolve. While the most anticipated elements of Subdistrict 2B are set for future phases, the parking garage fronting Forsyth Boulevard will come first.

Once planned as a garage with an architecturally interesting facade, such as the metal scales of the existing Centene garage a block east, then as a faux residential facade, the most recent renderings depict something that looks basically like a parking garage. The design has more architectural heft than pasting on architectural elements or art and may meld well with the adjacent auditorium. The south side of the garage is planned to be covered by future residential development.

Are you looking to buy or sell a home in Clayton? Ted is a Top-Ranked agent in Clayton, and Dielmann Sotheby’s was the #1 agency in Clayton for 2016. Get in touch with Ted!

 


Centene Corporate Auditorium, Parking Garage Design Revisions Presented